30-10-2017
The Turkish market is particularly profitable for Presezzi, who won another major contract, in fact Sistem Aluminyum AS awarded Presezzi Extrusion GROUP for the design and manufacturing of a new 19.5 MN 7” Front Loading Press and a 25,95 MN 8” Front Loading Press.
Both presses will be equipped with the most advanced automation system and energy saving system. Bosth presses will be completely assembled in the Presezzi workshop in Italy in order to fully test each component, moreover even all pipes and electrical cables will be made in Presezzi workshop Italy in order to reduce to a few days the installation time at the customer.
The installation and commissioning is scheduled to take place in spring 2018.